Where does the garden begin?

There are several steps from the purchase of land to the completion of landscaping. Let's sort out everything step by step.

1. Territory preparation - clearing and cleaning, removal of trees and shrubs, garbage removal.

2. Engineer plan - vertical layout of the territory, installation of a drainage system and storm sewers, laying the communications to the house.

3. Construction measures - installation of all concrete foundations, water and decorative structures.

4. Facing and decoration of the road-path network, all concrete foundations, foundation, facade of the house - if required. Laying all communications - light, automatic watering.

5. Gardening - planting trees and shrubs, planting flower beds, planting flowers, decorating a reservoir, arranging living corners and thematic green corners, alpine slides and other decorative elements.

6. The final stage - laying the lawn.

How much time a full job takes depends on many factors and, in particular, on the fact if the work will be on a free site, or there are already some buildings on it. If they are not there, then it is better to work in tandem with the architect, this will save time and use the available space in the most rational way.

In there are buildings, work is reduced only to the refinement of the territory, the construction of fences, arbors and other engineering structures, the planting of large-sized plants.

Imagine: a harmoniously executed personal plot, sustained in the same style,babbling brook, an alpine hill, a neatly laid out road, colorful flower beds and arbours in fascinating patterns - all this is landscape design.

Specialist consultation by phone: 8(499) 375-70-77

There are several steps from the purchase of land to the completion of landscaping. Let's sort out everything step by step.

1. Territory preparation - clearing and cleaning, removal of trees and shrubs, garbage removal.

2. Engineer plan - vertical layout of the territory, installation of a drainage system and storm sewers, laying the communications to the house.

3. Construction measures - installation of all concrete foundations, water and decorative structures.

4. Facing and decoration of the road-path network, all concrete foundations, foundation, facade of the house - if required. Laying all communications - light, automatic watering.

5. Gardening - planting trees and shrubs, planting flower beds, planting flowers, decorating a reservoir, arranging living corners and thematic green corners, alpine slides and other decorative elements.

6. The final stage - laying the lawn.

How much time a full job takes depends on many factors and, in particular, on the fact if the work will be on a free site, or there are already some buildings on it. If they are not there, then it is better to work in tandem with the architect, this will save time and use the available space in the most rational way.

In there are buildings, work is reduced only to the refinement of the territory, the construction of fences, arbors and other engineering structures, the planting of large-sized plants.

Imagine: a harmoniously executed personal plot, sustained in the same style,babbling brook, an alpine hill, a neatly laid out road, colorful flower beds and arbours in fascinating patterns - all this is landscape design.

Specialist consultation by phone: 8(499) 375-70-77

Need help or recommendation?

Leave a request, telephone consultation is free
Thank you for sending us a message!
Error
7 Bazhova street, VDNH metro station, Moscow, Russia